Managing Director - London
07773 130057
Managing Director
07712 870950
Head of Sales - Southern England
07712 870931
16 Noel StLondon W1F 8DA
020 7734 4466
Find out more
43 Western RdBracknell RG12 1RT
01344 353 800
40 Berkeley SquareBristol BS8 1HP
Make an enquiry
Home Projects Kao
We refurbished Kao’s operations centre in Hertfordshire, the global production site for their iconic English brand Molton Brown, aligning the space to modern working practices and creating a workplace that supports collaboration, wellbeing and productivity for a diverse mix of office, lab and factory staff.
Kao and Molton Brown wanted to update their Essex facility to better reflect current ways of working and improve the day to day experience of their teams. Having successfully delivered Kao’s award winning London office on Agar Street in 2022, we were well placed to bring the same design language and standards to its production site.
A key part of the brief was to create continuity with Kao’s London office, while also reinvigorating the Green Street space. Our design concept balanced functionality with biophilic elements and textural finishes, giving the offices and labs a fresh, natural feel that enhances wellbeing.
The ground floor now offers a more welcoming reception and tea point breakout area. The first floor features refreshed labs with lighting, ventilation and temperature control essential to performance. The second floor introduces collaboration areas, meeting rooms, pods and breakout spaces supported by new acoustic treatments to improve focus.
Visitors are now greeted by a more inviting reception area on the ground floor, complete with a refreshed tea point that encourages informal interaction. Upstairs, the first floor better supports high performance work, with upgraded labs featuring improved lighting, ventilation and temperature control. The second floor aids collaboration and focus, offering a mix of meeting rooms, pods and breakout spaces, all enhanced by new acoustic treatments.
Special attention was given to the multiple labs, which were modernised with wipeable ceiling tiles, improved airflow and carefully considered lighting, ensuring efficiency and comfort. To support the building’s infrastructure, a new mezzanine deck was installed, providing a plant and riser room with walkways, steps and handrails.
Delivering a twelve month refurbishment while Molton House remained fully operational required a phased programme and close collaboration with the client team. Molton Brown's move champion group kept staff engaged and informed throughout, helping to minimise disruption. The factory team also benefited from newly designed breakout areas, encouraging social connection and supporting wellbeing.
The completed refurbishment has given Molton Brown a workplace that is modern, efficient and aligned with Kao’s wider design standards. It provides a welcoming environment for staff and visitors alike, while ensuring that office, lab and factory teams can thrive together in one cohesive setting.
View project